S.No.
|
Client's
Name |
Type
of Job |
Quantum
of Work |
|
(061)
|
Lucky
Cement Limited |
Waste
Heat Recovery Project |
Complete
Project on E & I |
|
(060)
|
Mehran
Spices & Food Industries |
Electrical
Advisory & Installation
Activities
|
Modification
in Exsisting Electrical system, New Plant Electrification. |
|
(059)
|
Bosicar
Refinery |
Rehabilitation
of Electrical System at Hub.
|
Installation
of MCC's, Switchgears and Commisioning of Pumps. |
|
(058)
|
National
Refinery Limited |
Electrical
& Instrumentation Job
of Eight Tanks of FO / HSD / LUB Oil.
|
Electrification
of Loading Pumps, Lighting around the Tanks Area and tank roof
lighting, Complete Earthing including Earth Pits, Earthing rods
and ECP. |
|
(057)
|
Lucky
Cement Limited
|
Complete
Electrical / Instrumentation of 4200 Tons/Day Plant at Karachi.
Line " G "
|
Complete
Project on E & I
|
|
(056)
|
FWQ
Enterprises (Pvt.) Ltd.
|
Liquid
Cargo Terminal On BOT Basis
At Port Qasim
|
Intallation
of 200M Cable Tray. Installation of 52 Nos. of Poles of 11M
Height Complete Earthing including Earth rods and ECP |
|
(055)
|
Jamshoro
Joint Venture
(LPG Extraction Plant)
|
PLC
Based Emergency Shutdown
System for Storage Tanks
|
Complete
Installation and
Commissioning of ESD System including installation of Control
Valves, Level, Switches, PLC Panel and controlling from 200
M away through HMI Software |
|
(054)
|
Habib
Sugar Mills
Nawabshah
|
Operational
Supervision Contract
on Annual Basis
|
Complete
Advisory Services for smooth operation of Plant 8400 Tons /
Day |
|
(053)
|
ABB
Pakistan
|
Change
of Excitation Panels
|
Progressive
Changing of all Exicitation Panels for Turbo Alternator |
|
(052)
|
Kohat
Cement Limited
|
Electrical
/ Instrumentation
Installation Activities at Cement
Project at Kohat.
|
Complete
Electrical / Instrument. Installation Activities of 1 x 6700
Ton Per day Production |
|
(051)
|
Dewan
Cement Limited
|
Electrical
/ Instrumentation
Installation Activities at Extension
Project in Karachi.
|
Complete
Electrical / Instrument. Installation Activities of 1 x 2500
Ton Per day Production |
|
(050)
|
M.A
Corporation
|
KESC
Sub Station Job
|
Bowling
Alley in DHA. |
|
(049)
|
Lucky
Cement Limited
|
Complete
Electrical / Instrumentation of 8400 Tons/Day Plant at Karachi.
Line E & F
|
Complete
Project on E & I
|
|
(048)
|
Lucky
Cement Limited |
Complete
Electrical / Instrumentation of 3300 Tons/Day Plant at Pezu
Line 'D'
|
Complete
Project on E & I |
|
(047)
|
Universal
Board & Industries
|
Electrical
Work for 15 MW
Coal Firing Power Plant
|
Complete
Electrical Installation |
|
(046)
|
Lucky
Cement Limited |
Complete
Electrical / Instrumentation of 3300 Tons/Day Plant at Pezu
Line 'C'
|
Complete
Project on E & I |
|
(045)
|
Pakistan
State Oil
|
Rehabilitation
of Electrical System
at Sanghi depot.
|
Electrical
Upgrading |
|
(044)
|
Shah
Murad Sugar Mill
|
Consultancy
and Supervision
at Distillary Plant.
|
Consultancy
and Complete Supervision of the Installation and Commissioning
Activities
at Distillary Plant |
|
(043)
|
Attock
Cement
|
Coal
Firing System
|
Installition
Testing and
Commissioning of Coal Firing System (E&I Job) |
|
(042)
|
Pakistan
State Oil
|
Telephone
PABX at Tarujaba
|
Installation,
Testing & Commissioning of PABX |
|
(041)
|
Pakistan
State Oil (ZOT)
|
Supply
and Installation of
explosion proof lights
|
S/FX
16Nos. Explosion proof lights at ZOT |
|
(040)
|
SCO
|
Earthing
and Power Supply
Equipment
|
Complete
earthing network and Power Supply Equipment
24 Exchanges in Northern Areas from Gilgit to Khunjrab. |
|
(039)
|
Lucky
Cement Limited
|
Coal
Firing System
|
Installition
Testing and
Commissioning of Coal Firing System for 2x2400 Ton Cement Plant
( E & I Jobs ) |
|
(038)
|
PMO
Girls High School at Site 3
(
Joint Chief of Staff Project )
|
Complete
School Building
|
Complete
Turnkey Project Civil and Electrical Work |
|
(037)
|
Pakistan
State Oil
Pipri Marshalling Yard
|
Flood
lights for Tank Farm Area
|
Flood
Lights Installation
Quantity 200 Nos. |
|
(036)
|
Pakistan
State Oil
|
Complete
Electrical Installation work of Pumping House Upgradation
|
Sub-Station
Equipment MCCS, Pumps, Flood lights, Telephone / PA System |
|
(035)
|
Pakistan
State Oil
|
Tank
Lorry Filling System
|
Complete
automatic system of pump controls tank lorey filling at ZOT
and Chakpirana Oil handling Facility |
|
(034)
|
AL
Noor MDFB
|
Complete
Automation and
Visualization project.
|
Software
development on Siemens S7 Step7 and WinCC System with 500 I/O's |
|
(033)
|
Aerial
Lightning Project
(Joint Chief of Staff Project)
|
Installation
of Complete Lightning
Protection System
|
Complete
Electrical Work |
|
(032)
|
Dadabhoy
Energy Supply
Company
|
6.3
KV O/H Line
|
Complete
job of Power Plant
from Power House to Cement
Plant. |
|
(031)
|
Essa
Cement Industries
|
6.3
KV O/H Line
|
Double
Circuit 2.5Km. |
|
(030)
|
Dadabhoy
Energy Supply
Company
|
Installation
of H.F.O. Power Plant
15.2 MW
|
Complete
Electrical/ Instrumentation Job |
|
(029)
|
National
Technical Services
|
Electrical
/ Instrumentation
Installation at water tretment plant-Sui
|
Complete
Electrical / Inst. |
|
(028)
|
Essa
Cement Industries
|
Electrical
/ Instrumentation
Installation activities in 1000 tons/day
Extension Project
|
Complete
Electrical /
Instrumentation / Lighting
work from Raw Mill to Clinker Transport |
|
(027)
|
C.W.O
( Rif International )
|
Installation
of External Electrification
|
External
Electrification Job |
|
(026)
|
ICI
Pakistan Limited
|
Annual
Maintenance Contract
|
Complete
Electrical Work of
Office Establishment |
|
(025)
|
Tharparkar
Sugar Mills.
|
Commissioning
of 2x2.75 MW
Steam Turbo Alternaors.
|
-
PLC based Steam turbine
Controller.
- Paralleling of 2.7 MW Altern.
- Load sharing devices.
- GES- ALATHOM protection devices
- Battery Chargers.
- M.C.C. |
|
(024)
|
PPL
Kewali Pumping Station Kashmore.
|
Commissioning
of 2x3.5 MW HFO/ Gas Fired. GE - ALSTROM Engines
|
-
PLC based Engines Controller GE - ALSTROM.
( E&I Job) |
|
(023)
|
Friendship
Power
|
Synchronizing
of Generators
|
Synchronizing
of 3 Nos. Diesel
Generators 3 MW Capacity. |
|
(022)
|
Zarak
Textile Mills.
|
Installation/Testing/Commissioning
of Power House.
|
1
x 750 KW DG Set
2 x 750 KW Gas Gen. Sets.
( E&I Job) |
|
(021)
|
Lucky
Cement Ltd.
|
External
Electrification of Complete
Plant.
|
Supply
and Installation of Over 600 steel tubular poles along with
related cabling and earthing. |
|
(020)
|
Lucky
Cement Ltd.
|
Internal
Electrification of Power
House - 45 MW
|
Electrification,
Fire Alarm
and Telephone System. |
|
(019)
|
Allwin
Engineering Industries
|
Modification
of Power Distribution
System.
|
Complete
modification in
Distribution Network including
Insertion of MV Panels in existing Bus Bar. |
|
(018)
|
Allwin
Engineering Industries
|
Installation
of 2.5 MW Power House
|
3
Gas Generators alongwith
related switchgear. Complete Project |
|
(017)
|
Saita
Pakistan
|
Repair
Of Alternator
|
Repairing
of 650 KVA 400v,60 Hz Alternator Make : Platner France |
|
(016)
|
Hinopak
Motor Ltd.
|
Repairing
of Power Factor
Improvement Plant - 750 KVAR.
|
Replacement
of defective parts
and maintenance of sub-
station equipments |
|
(015)
|
Central
Telephone
Exchange
|
Rectification
of fault in 500 KVA
D.G. Set.
|
Replacement
of defective parts & trouble shooting |
|
(014)
|
National
Fibres Limited
|
Power
Supply to Two-For-One Twister Project : 53119
|
Manufacturing
of 04 Nos. Power DBs 04 Nos.Lighting DBs |
|
(013)
|
Lever
Brothers
Ice Cream Factory
|
Installation
of 3000 KVA Diesel Power House
|
Complete
Job of Power House at their "Walls" Ice Cream Factory
in Lahore. |
|
(012)
|
Saadi
Cement Limited
Haripur Hazara
|
Testing
of soil Resistivity
|
Testing
of soil Resisitivity
at plant site - Haripur Hazara |
|
(011)
|
First
Textile Mills Ltd.
|
Repair
Of Electronic Cards.
|
Repair
of Picanol Cards |
|
(010)
|
Central
Telephone
Exchange
|
Rectification
of fault in 60V, 200A Rectifier Panel.
|
Replacement
of defective
parts & troubleshooting. |
|
(009)
|
Lever
Brothers , Karachi.
|
Installation
of 1250 KVA D.G. Set
|
Complete
work of Power House in Margarine factory Karachi. |
|
(008)
|
Engro
Chemicals (Pak)
Limited
|
Study
of Power Factor System
|
Study
to suggest improvement & the cost impact in P.F. System. |
|
(007)
|
Pakistan Telecommunication Corporation |
Supply, Installation &
Commissioning of 100 KVAR
PFI Plant |
One Board with Auto Switching. |
|
(006)
|
Atlas Honda |
Supply & Installation of P.F.
Relays |
Complete job. |
|
(005)
|
Zainab Panjwani Hospital |
Installation, testing, Commissioning
of 110 KVA D.G.Set. |
Complete Work |
|
(004)
|
Dadabhoy
Cement Industries |
Consultancy
for Self Generation Project of 4MVA Capacity
|
Working
of finer details Meeting with supplier. |
|
(003)
|
Dadabhoy
Cement Industries
|
Checking
of Protection System
of complete plant.
|
Complete
M.V. Network |
|
(002)
|
Sunlight
Plywood Industries |
Modification
in 15 KV Isolators
panels to convert them to
C.B. Panel with MOCB.
|
06
Panels
01 Incoming / outgoing |
|
(001)
|
Sunlight
Plywood Industries |
Conversion
of 15 KV/400V 02 Nos. 2500 KVA Transformers
to 11 KV/400 V System. |
02
Units. |
|
|